Pumping Station Enclosure, Region of Peel

The Region of Peel waste-water pumping station was in need of serious upgrades to one of their facilities in Bolton. Verti-Crete was able to supply and install an 8 foot double sided precast panel to highly secure and enclose the fuel storage tank. Verti-Fence provided the city with a cost-effective, attractive solution that will stand the test of time.